Skip to main content
— Corporate & procurement

Everything your team needs to assess us properly

Procurement and facilities teams ask the same questions before they appoint an electrical contractor. The answers, and the evidence behind them, are collected here.

Registered company

CAC RC 1852579

Engineering led by

COREN-registered engineers

Installations follow

NEMSA requirements

Handed over with

Documented records

— The questions we get asked

What a reviewer checks, and where to find it

Six questions, six answers, each with a page that holds the evidence.

Is the company registered?

Kell Electricals Limited is registered with the Corporate Affairs Commission, RC 1852579.

Registration and compliance

Who is accountable for the engineering?

Work is led by COREN-registered engineers and follows NEMSA requirements for electrical installations.

Leadership and team

What documents do we receive?

Design drawings, circuit schedules, test records and as-built documentation, handed over at completion.

Engineering deliverables

How is site safety managed?

Our health, safety and environment approach is published, so your safety team can review it before any visit.

Health, safety and environment

Where have you done similar work?

Case studies set out the challenge, the solution and the outcome for work across commercial, industrial, education and public facilities.

Selected projects

How does an engagement run?

Assessment first, then a scoped proposal, installation, testing and handover. Scope is agreed before work starts.

How we work
— Our process

Assess, design, install, test and hand over

Scope is agreed before work starts, so your team knows what is being done and what you will receive.

Step 01:

Assess

Site survey, load assessment, and diagnostics. We measure the actual conditions before proposing a scope.

Step 02:

Design

A written design based on the assessed load: circuit schedules and single-line diagrams you keep.

Step 03:

Install

Work executed by our team to the documented design, with safety isolation and site protocols observed throughout.

Step 04:

Test & Handover

Commissioning tests, compliance checks, and as-built documentation handed over. Not just a completed job, a documented one.

— For your vendor file

Records we hand over

  • Design drawings
  • Circuit schedules
  • Test records
  • As-built documentation

Need something not listed here, such as a specific document for your vendor file? Ask on the form or call us and we will tell you what we can provide.

See engineering deliverables
— Get started

Ready to scope a corporate job?

Tell us about the facility and the work. We come back with the right next step, usually a site assessment.